Bromley Planning Portal: Search, Comment, Apply & Permission

Bromley planning • refreshed official task guide

Search, Comment, Apply, Validate or Report a Bromley Planning Issue

Use this as a practical dashboard: find live or historic records, use the Public Register, comment with planning reasons, apply through Planning Portal, avoid invalid status, check BNG/CIL and use enforcement only for real planning breaches.

SearchApplications / appeals / enforcement
Comment21-day normal window
ApplyPortal + 8MB email limit
ValidatePDF + BNG + CIL
★ Start with your task
What Are You Trying to Do Today?

Choose one action. Each card jumps to the exact checklist, official link and mistake to avoid.

Quick route: existing record = Bromley search/Public Register. New application = Planning Portal. Formal certainty = LDC. Invalid-information fixes = send directly to Bromley, not through Planning Portal. Suspected breach = Planning Investigations after checking history.
SERP gaps fixed

What This Page Adds Beyond Thin Search Results

🔁SystemTransition helpOld/new register note
📄PDF51-page auditConverted to tasks
📷PhotosMandatoryWhat to show
🌿BNG/CILBefore uploadAvoid invalid status
⚠️Invalid21 daysThen withdrawn
Fast answer

Which Bromley Planning Route Should You Use?

User taskUse this routeImportant detail
Find application, appeal or enforcement recordBromley Public Register / search guidanceCan include planning, building control, appeals, enforcements and TPOs.
Comment on applicationSubmit comments on application pageUse address where required; comments are public and not confidential.
Submit new applicationPlanning PortalBromley strongly encourages electronic submission; email attachments are limited to 8MB.
Fix invalid applicationEmail/post to BromleyDo not use Planning Portal for invalid fixes after submission.
Check if work is lawfulLawful Development CertificatePre-app advice is not the formal route for “do I need permission?” questions.
System transition

Old Public Access vs New Public Register

Why this matters

Bromley has been moving from an older Public Access system to a newer Public Register platform. During transition, some searches may need both routes.

When to check both

If a known reference, appeal, enforcement notice or historic case does not appear, do not stop at one failed search.

What to compare

Compare reference, address, decision notice, application type and date before assuming duplicate or missing records.

Best safe action

Use Bromley’s official search guidance first, then the Public Register. Contact planning support only if the live pages still do not resolve it.

Searcher tip: for older applications, enforcement notices or appeals, search by address and reference separately. Some systems index historic text differently.
Documents

What to Open Before You Comment, Buy or Build

📍FirstLocation planRed line + access
📐ThenDrawingsExisting/proposed
📷ThenPhotosCurrent and dated
💬ThenCommentsPublic representations
FinallyDecisionConditions + report
Public-comments reality: Bromley says planning correspondence can be viewed by the public, including the applicant. Letters of representation are displayed online with signatures, email addresses and phone numbers redacted.
Decision-date reality: Bromley says it does not notify applicants, agents, neighbours or other parties of expected decision dates. Use the register to track progress.
Comments

Comment, Object or Support Without Weak Points

1

Open the application record

Use the register and select “Submit comments” on the application details page.

2

Use a real address where required

Bromley asks for your address if you live in the borough so your objection can be properly considered. Objections without an address normally carry no weight.

3

Aim for 21 days

Bromley normally gives 21 days for comments. It may accept comments up to decision day, but anything received after decision cannot be considered.

4

Use planning issues only

Focus on lighting, highway safety, design, privacy, amenity, trees, conservation, listed buildings, access, parking, policy or similar planning impacts.

Use these pointsDo not rely on these
Light, outlook, privacy and amenityLoss of property value
Highway safety, access, parkingCommercial competition
Design, scale, materials and layoutLoss of private view
Trees, listed buildings, conservation and public rights of wayBuilding-work disturbance alone
Planning policy and previous decisionsLand ownership, private deeds or covenants
Accessibility help: Bromley says users who are housebound, need an interpreter or have a disability that makes viewing/understanding plans difficult should contact the council for help.
Permission check

Planning Permission, Prior Approval or LDC?

Planning permission

May be needed for building, extending, demolishing, developing land or changing the use of land/buildings.

Permitted development

Some work can be lawful without a planning application, but limits, property type, conditions and restrictions matter.

Existing LDC

Use for existing use, completed building operations or failure to comply with a planning condition where lawfulness needs formal proof.

Proposed LDC

Use before starting work if you want formal confirmation that proposed use or building operations are lawful.

Prior approval trap

Bromley notes prior approval does not confirm a change of use can lawfully be implemented; an LDC may be needed for that.

Pre-app limit

Pre-application advice is not the route to ask whether permission is required. Use permitted development/LDC guidance.

Apply safely

Apply for Bromley Planning Permission Without Avoidable Delay

Preferred route

Planning Portal is the easiest route for forms, documents and fee calculation.

Email route

Bromley encourages electronic submissions via Planning Portal or by email to planning@bromley.gov.uk.

8MB limit

Bromley states there is an 8MB email attachment limit. Compress or split files before sending.

A3 hard-copy limit

Bromley says it cannot scan hard-copy plans larger than A3. Larger plans should be electronic.

Two-week check

If no acknowledgement or invalid letter arrives within two weeks, contact planning support.

After valid

Bromley says it generally cannot keep applicants informed or negotiate/meet; track progress online instead.

Validation

Validation Process: What Happens After Submission?

StageWhat Bromley doesWhat you should do
File createdCreates a file and application number.Quote this reference in every email or call.
Officer allocationAllocates to a planning officer.Do not assume allocation means the application is valid.
Validation screeningChecks national and local validation requirements.Check forms, fee, plans, photos, BNG, CIL and reports before upload.
If validSends acknowledgement, neighbour/site notice where relevant, consultees and publishes online.Track online and watch for consultees, amendments and decision.
If invalidSends invalid reasons and suspends the application.Send missing items directly to planning.admin@bromley.gov.uk, not through Planning Portal.
21-day invalid deadline: Bromley says invalid applications are suspended until the requested information is received. The suspension time limit is 21 days. After that, the application is withdrawn and a new application is needed.
Invalid charge warning: Bromley states that from 1 August 2026 invalid-submission charges will apply if information is not submitted in line with Part 1 of the local/national validation requirements: £65 all other, £130 minor, £240 major.
PDF audit

What the Bromley Validation PDF Means in Practice

General PDF rules to follow before upload

  • Submit applications electronically through Planning Portal where possible.
  • Submit documents, photos and plans as individual PDF files, not one bundled document.
  • Remove personal data such as signatures unless the document must include it as evidence.
  • If a document is not intended for online publication, clearly identify it in the submission.
  • Complete all application-form sections, including Biodiversity Net Gain minimum information.
  • Do not duplicate the same person as both applicant and agent.
  • The proposal description must include all elements of the development and not include unrelated works.
PDF structure: Bromley’s validation PDF has two parts: standard national/Bromley requirements for application types, and technical supporting documents for more complex proposals or triggered site constraints.
Plans and photos

Site Location Plan, Drawings and Photo Requirements

📍Location plan1:1250/1:2500Red line + north
🟦OwnershipBlue lineAdjoining land owned
📐PlansAccurate scaleDimensions + scale bar
📷PhotosMandatoryUse photo guide
🧭ContextNearest roadsShow adjoining property
DocumentWhat Bromley expectsUser check
Site location planUp-to-date plan, red outline, north point, roads/buildings and access land.Do not add confusing extra coloured outlines; use blue only for adjoining owned land.
Block/site planAccurate scale, boundary distances where relevant, parking, trees and boundary treatment.Show proposed works in relation to site boundaries.
Floor plansExisting/proposed plans with accurate scale and key dimensions.For new dwellings, annotate unit and room sizes.
ElevationsKey dimensions, overall height, dormer height/width/depth and solar panel projection where relevant.Do not show only the “nice” elevation; provide all visible elevations.
Sections and streetsceneRequired for level changes, sloping ground, raised patios/pools or streetscene context.Show existing and finished levels, floor-to-ceiling heights and relative neighbour heights.
BNG + CIL

Biodiversity Net Gain and CIL: Do Not Leave These Until Invalid Letter

BNG minimum information

Complete the relevant Biodiversity Net Gain information in the standard application form.

Metric

The biodiversity metric should show the site’s pre-development value. Non-major applications may use the Small Sites Metric.

Earlier baseline

If using an earlier baseline date, state the date and explain why it is proposed.

Exemption

If claiming BNG exemption, submit an exemption statement. Self/custom build exemption needs Bromley’s proforma.

10% gain

Relevant major and non-major development must demonstrate minimum 10% Biodiversity Net Gain unless exempt.

CIL Form 1

CIL Form 1 is required as a minimum for full planning, householder, LDC and reserved matters following outline permission.

Practical upload rule: line up your landscape plan, BNG statement/metric and site layout plan. The PDF says layout/landscape plans should correlate with BNG information.
Technical reports

Technical Documents Triggered by Site, Scale or Location

Report / statementTrigger examplesWhat to prepare
Design and Access StatementMajor schemes, dwellings/floorspace in conservation areas, listed building consent.Explain design response, access and how London Plan design requirements are met.
Heritage StatementListed building or conservation area impact.Assess significance, impact and mitigation.
Flood Risk AssessmentLarge floorspace, flood zones 2/3, flood zone 1 sites over threshold or increased vulnerability.Risk, drainage, vulnerability and mitigation evidence.
Ecology / Species SurveyDesignated areas, SSSI/SINC/AONB/local nature reserves or protected species risk.Preliminary ecological appraisal and species surveys where relevant.
CLMPMajor proposals, 5+ dwellings, main high street impact or construction traffic risk.Vehicle routes, wheel washing, access controls, waste, deliveries and timing.
CEMPMajor proposals.Noise, dust, air quality and Non-Road Mobile Machinery details.
Tall Buildings Impact AssessmentBuilding above 6 storeys or 18m to uppermost storey floor level.Visual, townscape, design, amenity and policy evidence.
Whole Life-Cycle Carbon AssessmentMayor-referrable schemes; encouraged for non-referrable major development.GLA template, carbon-reduction actions and London Plan SI2 evidence.
Checklist chooser

Choose the Right Bromley Validation Checklist

Householder

🏠 Householder works

Single family dwelling alterations/extensions. Not flats, maisonettes or new dwellings.

Checklist Hub
New dwellings

🏘️ Up to 9 dwellings

Use full planning checklist for new dwellings, including flats, parking, BNG, CIL and technical reports.

New Dwellings Checklist
Change of use

🏢 Change of use

Check use class, planning statement, transport, noise, ventilation and amenity triggers.

Checklist Hub
LDC

📜 Existing or proposed LDC

Existing evidence and proposed-lawfulness cases are different. Choose the right form.

LDC Guidance
Condition

✅ Details reserved by condition

Say exactly which condition each document relates to. Missing condition mapping can make it invalid.

Condition Checklist
Section 73

🔁 Vary/remove condition

Different from submitting details reserved by condition. Include the original permission and condition numbers.

Section 73 Checklist
Pre-application advice

When Bromley Pre-App Advice Is Worth Using

Major proposals

Use for 10+ residential units, 0.5ha+ residential sites, 1000sqm+ or 1ha+ other development, minerals/waste or EIA development.

Bespoke major

Use early for 150+ units, tall buildings, 10,000sqm+ net commercial floorspace or sites over 2.5ha.

Non-major

Use for householder, 1–9 dwellings, smaller commercial floorspace, change of use, adverts and telecom proposals.

No meeting for non-major

Bromley’s non-major service gives a written response and a site visit if required, but no meeting.

Payment reference

After online payment, include the payment reference with the request so Bromley can match it quickly.

Not for permission-needed question

Bromley says information about whether permission is required is not available through pre-app advice.

Householder phone advice limit: this service is only for householder proposals already determined, within six months of decision, after reading the delegated/committee report and decision notice. It is not first-application advice.
Decision + appeals

Decision Route, Conditions and Appeals

Decision basis

Applications are decided against the development plan unless there is a good reason not to do so. Bromley Local Plan and London Plan policies matter.

Delegated route

Bromley has delegated authority and planning committee routes and aims to determine most applications under delegated powers.

Committee comments

Comments received after committee report publication are normally summarised verbally at committee.

Applicant appeal

Applicants can appeal refusal, conditions or non-determination if no decision is issued within the statutory period, normally eight weeks.

Appeal deadline

Householder appeals are normally due within 12 weeks of decision notice. Most other appeals are within six months.

Appeal comments

Application-stage comments are sent to the Planning Inspectorate if there is an appeal. Further appeal comments must follow Inspectorate instructions.

Before building: read the decision notice, approved plan numbers, conditions and any details reserved by condition. Permission headline alone is not enough.
Enforcement

Report a Bromley Planning Breach Correctly

1

Search history first

Check if the works/use has permission, an LDC, a condition discharge, an amendment, an appeal or an enforcement notice.

2

Check if it is planning enforcement

Bromley investigates unauthorised building, unauthorised use, non-compliance with plans/conditions, listed/conservation issues, unlawful adverts and untidy sites.

3

Do not report non-planning issues

Bromley says it does not investigate noise/smells alone, construction methods alone, private access/boundary disputes or private covenant restrictions.

4

Send useful evidence

Include site address, what happened, when it started, why permission may be missing, harm caused, photos if safe and any planning references found.

Compliance check option: Bromley lists a chargeable compliance check service to confirm whether a development complies with planning regulations. The enforcement page states a £100 fee.
Troubleshooting

Bromley Planning Search, Comment or Application Problems

ProblemTry firstWhy
No record foundSearch reference, postcode, one address line, road, property search, weekly list and Public Register.System transition and address wording can affect search results.
Comment carries no weightInclude address where required and write planning reasons only.Anonymous or addressless objections cannot normally be weighted.
Application invalidSend every missing item to Bromley directly, not via Planning Portal.Bromley says it cannot retrieve invalid fixes submitted through Planning Portal.
Large files rejectedUse Planning Portal or split/compress files under 8MB email limit.Bromley states an 8MB email attachment limit.
Large hard-copy planProvide plans larger than A3 electronically.Bromley cannot scan hard-copy plans larger than A3.
Need formal no-permission proofUse LDC, not pre-app advice.Pre-app advice is not for confirming whether permission is required.
Contact routes

Bromley Planning Contact Routes

Planning support

Telephone: 020 8313 4956. Email: planning.admin@bromley.gov.uk.

Planning general

Bromley lists planning@bromley.gov.uk for general planning/application submissions where appropriate.

Planning Investigations

Telephone: 020 8461 7730. Email: planninginvestigation@bromley.gov.uk.

Planning Appeals

Email: planningappeals@bromley.gov.uk. Use your decision notice and appeal guidance first.

Postal investigations

Planning Investigations, Bromley Civic Centre, Churchill Court, 2 Westmoreland Road, Bromley, BR1 1AS.

Before contact

Prepare reference, address, screenshot, document name, date, what you need checked and whether you are applicant, neighbour, owner or agent.

Address caution: Bromley pages list different postal addresses for different tasks. Use the exact address shown on the official page for your route.
Verified internal help

Use This Site Safely Before Official Action

Internal guide

📘 How to Use This Website

Use this website for planning research, then complete final action on official council, GOV.UK or Planning Portal pages.

Read Safe Use Guide
Internal policy

🔗 Official Links Policy

Explains why official links are labelled and placed beside the exact planning task they solve.

Read Link Policy
Internal policy

✅ Source Verification

Explains manual checks for official council links, maps, contact routes and planning sources.

Read Verification Policy
Official source audit

Official Bromley Details Converted Into User Steps

  • Search: progress tracking, plans, documents, comments, weekly lists, historic applications, property details and enforcement notices.
  • Public Register: planning, building control, appeals, enforcements and Tree Preservation Orders.
  • Comments: normally 21 days, not confidential, cannot consider anonymous objections, late comments after decision cannot be considered.
  • Apply: Planning Portal preferred; email attachments limited to 8MB; hard-copy plans larger than A3 must be electronic.
  • Validation: file created, reference allocated, officer assigned, national/local screening, valid publication or invalid suspension.
  • Invalid applications: fixes must go to Bromley directly, 21-day suspension, possible withdrawal and future invalid-submission charges.
  • PDF: individual PDF files, no bundles, remove personal data, BNG minimum info, CIL Form 1, red-line location plan and technical reports.
  • Enforcement: use for real planning-control breaches, not private boundary/covenant issues or noise/smells alone.
FAQs

Bromley Planning Portal FAQs

Where do I search Bromley planning applications?

Use Bromley’s planning applications search guidance or the Planning and Building Control Public Register. The register can search planning applications, building control applications, appeals, enforcements and TPOs.

How do I comment on a Bromley planning application?

Open the application record and select “Submit comments”. If you cannot use the internet, Bromley says you can write to the council quoting the planning reference number.

How long do I have to comment?

Bromley normally gives a 21 day period for comments. Representations may usually be accepted up to the day of decision, but comments received after a decision cannot be considered.

Are Bromley planning comments confidential?

No. Bromley says correspondence received about planning applications can be viewed by the public, including the applicant. Letters are displayed online with signatures, email addresses and phone numbers redacted.

Can I object anonymously?

No. Bromley says it is unable to consider anonymous objections. Objections without an address cannot normally be given weight in the decision.

What is Planning Portal used for in Bromley?

Planning Portal is used to submit applications, complete forms, upload documents and calculate fees. Bromley’s local register is for existing records, comments and tracking.

Why is my Bromley planning application invalid?

It may be missing national or local validation requirements such as forms, fees, plans, photos, ownership certificates, BNG information, CIL Form 1 or technical reports.

How long do I have to fix an invalid application?

Bromley says the suspension time limit for an invalid application is 21 days. After this period the application is withdrawn and a new application must be submitted.

Do I need an LDC?

Use a Lawful Development Certificate when you need formal confirmation that existing or proposed use, operations or failure to comply with a condition are lawful for planning purposes.

How do I report a planning breach?

Search history first, then report in writing or by email to Bromley Planning Investigations with the site address, what happened, dates, harm, photos and any planning references found.

Editorial disclaimer: This guide helps users navigate Bromley planning tasks in plain English. Planning records, consultation dates, fees, validation requirements, BNG/CIL rules, permitted development, enforcement action and appeal deadlines can change. Always verify live records, forms, fees and legal requirements on Bromley Council, GOV.UK or Planning Portal official pages before acting.
Final summary

Use the Right Bromley Planning Route

🔎Find recordRegisterReference first
💬CommentSubmit comments21-day target
📤ApplyPlanning PortalForms + fees
ValidatePDF + listsBNG + CIL
⚠️BreachInvestigationsEvidence needed