Wandsworth Planning Portal: Search & Applications Help

Wandsworth planning help • Planning Explorer, archive, map, comments, applications, validation, CIL, BNG, enforcement

Search Wandsworth Planning Records, Comment Safely and Submit Applications Without Missing a Step

Use Wandsworth Planning Explorer for post-2000 cases, the Planning Archive for older applications, map search for nearby activity, and Planning Portal for new submissions.

This guide turns Wandsworth’s official pages and PDFs into practical steps for documents, privacy, consultation, file limits, validation, BNG, CIL, pre-app advice and enforcement.

🔎 Post-2000: Planning Explorer 🗂️ Pre-2000: Planning Archive 💬 21-day consultation typical 📁 25MB total / 5MB per file ☎️ 020 8871 6000
★ Start here
Pick the Wandsworth Planning Task You Need Today

Do not start from a generic “planning portal” link. Choose the task first, because Wandsworth uses different official routes for searching, commenting, applying, pre-application advice, CIL and enforcement.

Correct route: existing application after 2000 = Planning Explorer. Older application = Planning Archive. Nearby live/decided cases = map search. New application = Planning Portal. Unsure whether permission is needed = permitted development / pre-application advice. Possible breach = check permission history first, then use the right enforcement form.
Wandsworth Planning Portal search page for planning applications, documents, comments and decisions
Use Wandsworth planning search to find applications, view documents, check decisions, comment online and start the correct application route.
SERP + official audit

What This Wandsworth Refresh Adds Beyond Basic Search Results

Search-route clarity

It separates Planning Explorer, the pre-2000 Planning Archive, map search, recent decisions, appeals, Planning Portal and enforcement forms.

PDF-to-action guidance

Validation, maps/plans, BNG, CIL and file-upload details are converted into checklists that users can follow before clicking an official link.

Practical Wandsworth warnings

Includes the 4,000-character comment limit, public comment visibility, 21-day consultation, 14-day re-consultation, small-site housing contribution, CIL penalties and enforcement limits.

Fast facts

Wandsworth Planning Facts Before You Click

🔎Post-2000 casesExplorerSearch online
🗂️Pre-2000 casesArchiveOlder applications
💬CommentsPublishedName/address needed
📁Upload limit25MB5MB per file
🌿BNG10%Where applicable
Scan menu

Jump to the Exact Wandsworth Planning Help

Correct route

Wandsworth Planning Explorer vs Planning Portal

The phrase “Wandsworth planning portal” usually hides two different user needs: searching an existing Wandsworth case or submitting a new application. Use the table below before opening a form.

Your taskCorrect official placeWhat to do nextCommon mistake
Search application submitted after 2000Wandsworth Planning ExplorerUse reference, general search, address/property, applicant/agent or date search.Opening Planning Portal to search local records.
Search application before 2000Wandsworth Planning ArchiveTry old address wording, street name or historic reference.Assuming older files are still on microfiche.
Comment on a live applicationPlanning Explorer application recordOpen associated documents, then use the comment button if consultation is open.Putting email/phone/signature in public comment text.
Submit a new applicationPlanning PortalPrepare forms, fee, plans, file sizes, CIL form, BNG checklist and validation documents.Uploading CAD/oversized files or missing CIL/BNG forms.
Report a possible breachWandsworth planning enforcementCheck permission history first, then choose the right report form.Reporting party-wall, boundary or builder-conduct disputes as planning breaches.
Archive / map

Use the Planning Archive, Map Search and Area Notifications

Wandsworth says its planning records are maintained online. Use Planning Explorer for applications submitted after 2000 and the Planning Archive for applications submitted before 2000.

NeedWhere to lookWhat to check next
Application after 2000Planning ExplorerSearch by reference, address or general criteria.
Application before 2000Planning ArchiveTry historic address wording or street name.
Applications in an areaMap searchWandsworth says live applications are highlighted in red.
New nearby applicationsArea notification requestRequest notifications for a chosen area.
Enforcement notice historyPlanning enforcement pages and database statusCheck whether the online service is currently available before relying on it.
Neighbour-watch tip: a map pin or neighbour letter is only a starting point. Always open the full application record and latest associated documents before writing a comment.
Documents

Documents to Read Before You Comment, Buy or Build

Do not rely only on the short proposal summary. Most useful answers are inside the latest drawing, officer report, consultation response, CIL form, BNG checklist, decision notice or condition wording.

Open thisWhy it mattersWhat to check
Application formShows applicant, proposal, certificates, floorspace and application type.Proposal wording, ownership certificate, CIL answers and exact site address.
Location planDefines the application land.Red line, blue line, north arrow, scale and access to the highway.
Existing and proposed drawingsShows what physically changes.Floor plans, elevations, roof plans, sections, scale bar and revision date.
Design, access or planning statementExplains how policy issues are addressed.Design, heritage, amenity, transport, waste, trees, flood and sustainability claims.
BNG, ecology, daylight, flood or energy reportCan decide sensitive London sites.Baseline, methodology, mitigation, metric, UGF, daylight/sunlight and flood resilience.
Officer report and decision noticeControls approval/refusal and future works.Approved drawing numbers, conditions, reasons, S106/CIL references and appeal status.
Revision warning: Wandsworth cases can change during assessment. Before you object, buy or build, check whether amended drawings replaced the version you originally saw.
Comments

Comment, Object or Support a Wandsworth Planning Application

Anyone can comment on, support or object to a planning application, but the council can only take account of planning considerations. Comments are public, so write for the planning file, not as a private message.

1

Find the correct case

Use the reference or other details in Planning Explorer. Wandsworth warns that you should ensure there are no spaces after the application reference number.

2

Open associated documents

Use the link labelled “View Associated Application Documents & Make Online Comments for Live Applications”.

3

Use the comment button while open

If the application is still open for consultation, scroll to “Comment on application” and follow the online form.

4

Keep the comment concise

The online form has a 4,000-character limit. Use numbered planning points or submit an additional form if needed.

Privacy warning: Wandsworth says your comment, including your name and address, will be published and form part of the statutory register. Do not include your email address, phone number or signature in the comment text if you do not want them published.
Timing: most applications have a 21-day consultation period. Wandsworth says late comments may be accepted until a decision is made, but online comments are usually processed faster than email.
Planning reasons

Planning Points Wandsworth Can Use vs Weak Objections

Useful planning issueUsually weak / not planningBetter wording
Traffic, parking and servicingGeneral inconvenienceExplain access, visibility, loading, deliveries, parking pressure, cycle conflict or servicing gaps.
Design, appearance, scale and townscape“I do not like it.”Refer to height, massing, materials, roofline, street scene, riverside context or conservation character.
Overlooking, disturbance, light and privacyLoss of private viewRefer to window position, separation distance, height, orientation, gardens and affected rooms.
Trees, BNG, ecology, flood risk and local environmentGeneric “environmental concern”Identify missing BNG metric, tree impact, flood-zone issue, SuDS gap, habitat or Urban Greening weakness.
Suitable use and policy fitCompetition between businessesExplain noise, hours, use-class conflict, servicing, amenity or policy conflict.
Heritage and listed buildingsProperty valueExplain harm to significance, setting, conservation-area character or historic fabric.
Wandsworth says it cannot take into account: loss of property value, private neighbour disputes, leases/covenants, construction impact, competition between firms or Party Wall issues.
Permission check

Check Whether Your Wandsworth Project Needs Planning Permission

Some building works may be permitted development, but Wandsworth warns that permitted development does not apply to flats, caravans or other buildings, and can be restricted in conservation areas, listed buildings and where TPO trees are affected.

SituationCheck firstBest next action
House extension or alterationPermitted development, conservation area and Article 4 restrictions.Use Planning Portal guidance and Wandsworth pages before starting.
Flat or converted-house flatNormal householder permitted development rights may not apply.Use full planning forms where required.
Listed building or conservation areaHeritage consent, demolition controls, materials, windows, roof changes and signage.Prepare heritage evidence and do not start without checking.
Tree worksTree Preservation Order and conservation area tree controls.Check constraints and use the tree works route if required.
Commercial works, adverts or change of useUse class, advertisement rules, plant, extraction, noise and CIL.Use pre-application advice for unclear or sensitive proposals.
Apply online

Apply for Wandsworth Planning Permission Through Planning Portal

Wandsworth says the easiest way to submit is through the national Planning Portal, where you can make the application and payment online. Wandsworth also notes a Planning Portal service charge in addition to the planning application fee.

1

Check whether permission is needed

Review permitted development, Article 4 Directions, conservation areas, listed buildings, TPO trees and building-control needs.

2

Choose the right application type

Householder, full, lawful development, listed building, advertisement, non-material amendment, condition discharge and variation routes have different requirements.

3

Prepare validation documents before upload

Use the Local Validation Checklist and file rules first. This avoids delays caused by missing plans, weak drawings, unclear file names or oversized documents.

4

Complete CIL and BNG checks

Wandsworth says applicants should be familiar with CIL and complete the CIL additional information form. BNG is mandatory unless an exemption applies.

5

Watch the validation date

The validation date can differ from the received date. Missing information can mean your application has been received but not validated.

Small-site contribution warning: Wandsworth says the £50,000 per dwelling affordable housing contribution for applicable 1–9 dwelling applications applies to all applicable applications validated after 11:59pm on 28 July 2026.
Plans

Location Plans, Block Plans, Red Line and Blue Line Rules

Wandsworth’s maps and plans guidance says planning applications need a site location plan showing the proposal in context and a block/site plan showing the development in more detail.

Plan itemWhat Wandsworth expectsMicro-action before upload
Site location planStandard metric scale, typically 1:1250 or 1:2500, with north shown.Scale to fit A4 and show enough surrounding roads/buildings.
Red lineApplication site boundary and all land needed for the development, including access, outlined in red.Include land needed for access, servicing, visibility, parking and landscaping.
Blue lineOther land owned by the applicant close to or adjoining the property.Draw it where relevant; do not hide nearby ownership.
Block planStandard metric scale showing the proposal in relation to boundaries and existing buildings.Add boundary dimensions and show north.
Trees, rights of way, hard surfacing and boundariesShown unless they would not influence or be affected by the proposal.Show adjoining access, trees, public rights of way and boundary treatment.
OS mappingNot Land Registry, not photocopy, not screen grab, not reused for multiple applications.Use licensed mapping and include correct copyright/licence details.
Upload rules

Electronic Planning File Rules That Prevent Wandsworth Delays

Wandsworth has specific requirements for file type, file size, naming, colour, scale, paper size and orientation. These are small details, but they can delay validation if missed.

File ruleWandsworth requirementDo this before upload
CAD filesNot accepted.Convert scale drawings to scalable PDF.
Scale drawingsPDF format, scalable to original paper size.Test print and verify scale after export.
Total online file sizeCombined files should not exceed 25MB.Split large reports and label Part 1 / Part 2.
Individual file sizeEach file should not exceed 5MB.Compress carefully; 300dpi is usually adequate for black-and-white drawings.
File namesMaximum eight-character prefix plus clear description, such as DRWG0001SiteLayout.pdf.Use unique file names, drawing numbers and version/issue numbers.
Do not submitNo .exe files or zip utilities.Upload separate safe files so they are viewable and virus-safe.
Scale barPlans should include scale bar showing one metre and ten metres plus key dimensions.Add scale bar, print size, north point and distances from boundaries.
OrientationDocuments should be correctly orientated for screen display.Rotate PDFs before upload and keep page orientation consistent.
Validation

Wandsworth Local Validation Checklist Converted Into Applicant Actions

The Local Validation Checklist sets out national and local information needed to determine applications. It says local-list items are requested where proportionate to the nature, scale and location of the development.

National requirements to check first

National itemWhy it mattersMicro-action
Application formCore project and legal information.Complete every relevant section, including units, floorspace, parking, open/protected space and residential data.
Site location planIdentifies the application land.Use up-to-date map, north, red line, blue line and enough adjoining context.
Site plan, floor plans, sections and elevationsShows existing and proposed development.Use an identified scale and include linear scale bars, especially for electronic submissions.
Appropriate feeApplication cannot be validated without correct payment.Use fee calculator and remember the Planning Portal service charge is separate.
Ownership certificateConfirms ownership and notice served on other owners.Do not use Certificate A unless you own all relevant land and there are no agricultural tenants.
Design and Access StatementRequired for major development and some designated-area cases.Check triggers before submission, especially heritage, major and sensitive-site proposals.

Local-list triggers to self-check

Local-list itemWhen it can matterPrepare this
Fire safety strategy / statementMajor applications and relevant London building-height situations.Use competent fire input and align the statement with plans.
Air quality assessmentSensitive or pollution-generating development.Assess exposure, emissions, construction effects and mitigation.
Biodiversity and BNGMost applications must consider biodiversity impacts or exemption.BNG checklist, metric where needed, habitat plan and mitigation.
Energy, carbon and sustainabilityAll new residential and major non-residential development need energy evidence.Energy assessment, carbon strategy, overheating and offset evidence if triggered.
Daylight and sunlightHost/adjoining buildings, gardens or rooms may be affected.BRE-style assessment with existing, consented and proposed effects.
Flood Risk AssessmentFlood zones 2/3, 1ha+ sites, critical drainage or vulnerable uses.FRA, sequential test, emergency plan, SuDS and safe access where needed.
Heritage / archaeologyListed buildings, conservation areas, archaeology or setting impact.Heritage statement, significance assessment and detailed drawings.
Waste and servicingResidential, commercial, mixed-use and construction-heavy schemes.Waste storage, collection route, loading/unloading hours, vehicle size and swept paths.
Invalid application killers: Wandsworth’s process page lists common invalid reasons including no fee, missing fire certificate information, no CIL form, no scale bar, wrong forms and incorrect address. Fix these before upload.
BNG / ecology

Biodiversity Net Gain and Urban Greening in Wandsworth

Wandsworth says BNG is mandatory for all new planning permission applications, with major development covered from 12 February 2024 and small sites from 2 April 2024.

BNG issueWhat Wandsworth expectsApplicant action
Exemption claimEven if exempt, complete the BNG Checklist and state the reason.Do not simply write “exempt”; explain why and provide evidence.
Minimum 10% gainDevelopment subject to BNG must show at least 10% gain over pre-development site value.Measure baseline before clearance and submit clear metric evidence.
MetricMajor developments and some small sites need the statutory biodiversity metric.Use a competent person; use an ecologist for specialist habitat issues.
Small sitesSmall Sites Metric may be used unless exceptions apply.Use statutory metric if priority habitats, protected sites or European protected species are present.
500m checkIf statutory protected sites or priority habitats are within 500m, consider ecologist input.Check before finalising layout and landscaping.
Mitigation hierarchyAvoid and minimise impacts before mitigation or compensation.Retain valuable habitats first; offsite units/credits cost more and need justification.
Urban Greening FactorMajor proposals should meet London Plan UGF targets unless justified.Coordinate UGF, BNG, landscape, SuDS and amenity space at design stage.
Design tip: Wandsworth recommends supplying a fully completed metric and a to-scale post-development BNG habitat plan from the outset where BNG applies.
CIL / obligations

Community Infrastructure Levy, CIL Forms and Penalty Traps

Wandsworth is responsible for collecting Mayoral and Wandsworth CIL. Missing forms or starting works before the correct CIL steps can have major financial consequences.

CIL issueWhy it mattersMicro-action
CIL Additional Information FormWandsworth says applicants should be familiar with CIL and complete the additional information form.Submit it with the application where required.
CIL liable developmentNew floorspace or new dwellings can be CIL-relevant.Answer CIL questions carefully and keep existing floorspace evidence.
Assumption of LiabilityFailure can lead to £50 surcharge and possibly further £500 apportionment surcharge.Assume liability as soon as reasonably practicable after permission.
Commencement NoticeFailure before start can create a surcharge of 20% of chargeable amount or £2,500, whichever is lower.Do not start works until a valid Commencement Notice has been submitted.
Self-build / annex / extension reliefRelief lapses if not granted before commencement.Claim and receive relief before starting.
Planning obligationsCIL does not replace every site-specific mitigation or affordable-housing contribution.Check S106/planning obligation exposure early.
Do not start work early: Wandsworth’s CIL page warns that failing to submit a valid Commencement Notice before development starts can trigger a surcharge and immediate full payment consequences.
Pre-application

Pre-Application Advice Before You Submit

Wandsworth offers free general duty-planner advice for householders and a chargeable pre-application service for detailed advice. Pre-app advice does not decide the later application, but it can reveal problems before you pay for a full submission.

Advice routeUse it forPrepare before asking
Free duty plannerGeneral householder advice, not detailed acceptability of a proposal.Email planning@wandsworth.gov.uk with address, proposal summary, photos and drawings if available.
Chargeable pre-application adviceDetailed policy, design, timescale and process advice.Use the request form and provide enough detail so the correct fee can be calculated.
Complex / major scheme adviceResidential, commercial, heritage, riverside, BNG, transport or public-realm-sensitive proposals.Submit plans, red line, design options, policy questions, technical issues and constraints.
Problem with requestForm, payment or process issue.Email wandsworthpre-applications@wandsworth.gov.uk.
Response timing: Wandsworth says it aims to respond to free duty-planner enquiries by email within 20 working days.
After submission

After You Apply: Validation, Consultation, Amendments, Decision and Appeals

Once Wandsworth receives an application, it follows validation, publication, consultation, assessment, site visit, report and decision stages. The live case status can be checked through Planning Search after validation.

StageWhat Wandsworth saysUser action
Target timescales8 weeks for householder/small scale, 13 weeks for major, 16 weeks for EIA applications.Check case status, but remember invalidity or amendments can change timing.
Application validationWandsworth checks everything submitted, including fees; invalid applications trigger an email.Respond within two months with missing information/payment or the application may be withdrawn.
Neighbour notificationConsultation letters are sent within one week of valid registration.Neighbours should open documents as soon as notified.
Site and press noticesDisplayed within two weeks of valid registration.Check the application online even if you saw a site notice.
Public commentsPublic notified for three weeks; objections and supportive comments can be submitted.Comment early and use planning reasons.
AmendmentsSmall revisions may be requested; major changes may need a new application.Applicants should respond by the officer deadline and check whether public re-consultation happens.
Decision / committeeOfficer report is reviewed by a senior officer or referred to Planning Applications Committee.After decision, read the notice, report, approved plans and conditions.
AppealAppeals are handled by the Planning Inspectorate and have strict time limits.Check appeal deadline immediately after refusal, non-determination or disputed conditions.
Enforcement

Report a Wandsworth Planning Breach the Right Way

Before reporting, check the planning applications database to see whether permission, advertisement consent, listed-building consent, tree consent, condition approval or lawful development has already been granted.

1

Check permission history first

Search Planning Explorer for approvals, conditions, lawful development certificates, listed-building consent, tree cases, advertisements and enforcement records.

2

Choose the correct breach type

Wandsworth provides routes for unauthorised building works, breach of condition, unauthorised change of use and unauthorised advertisements.

3

Prepare evidence

Use full address, dates, photographs, planning reference, condition number, breach type and how it causes planning harm.

4

Know what planning enforcement cannot fix

Boundary disputes, party-wall disputes, builder conduct, internal works to non-listed buildings, building regulations and highways obstructions are usually outside planning enforcement.

Can be investigatedUsually not investigated
Development carried out without planning permissionParty-wall disputes
Material change in land useBoundary disputes or trespass
Breach of planning permission, condition or S106Deeds and covenants
Illegal advertisementsBuilder conduct or private neighbour disputes
Unauthorised listed-building works, protected-tree works or demolition in conservation areasBuilding Regulation issues or internal works to non-listed buildings
Untidy land or high hedges in relevant casesPublic rights of way, highways obstructions or general environmental complaints handled by other teams
Enforcement reality: Wandsworth’s Local Enforcement Plan explains that enforcement is discretionary and should be proportionate. Strong reports use evidence, dates, exact location and planning harm.
Contact

Wandsworth Planning Contact, Address and Map Reference

Use online routes first. When emailing, include the application reference, site address, applicant/agent name if relevant, proposal and your exact question.

☎️Switchboard020 8871 6000Council contact
📧Planningplanning@wandsworth.gov.ukUse reference
💷CILcil@wandsworth.gov.ukForms / notices
🧭Pre-appwandsworthpre-applications@wandsworth.gov.ukPre-app issues
📍AddressSW18 2PUTown Hall

Wandsworth Town Hall, Wandsworth High Street, London SW18 2PU

This map is a general council-location reference. Use official online routes for planning searches, comments, applications, CIL forms and breach reports.

Troubleshooting

If Wandsworth Planning Search or Upload Does Not Work

ProblemLikely reasonTry this first
Reference not foundWrong format, spaces, partial reference or pre-2000 case.Use YYYY/XXXX, remove spaces, try wildcard %, general search or archive.
Too many resultsSearch too broad.Add date, address, applicant, agent, status or case officer.
Cannot commentApplication not open for consultation or wrong link opened.Use the associated documents/comment link and check consultation status.
Comment privacy concernComments are published with name/address and form part of the statutory register.Do not put email, phone or signature in the main comment text.
Upload rejected or slowCAD/zip/exe, oversized files, unclear names, no scale bar or inconsistent orientation.Use scalable PDFs, 5MB per file, 25MB total, clear names and scale bars.
BNG uncertaintyExemption, small-site metric or protected habitat trigger unclear.Complete BNG checklist and get ecology advice before layout is fixed.
CIL riskMissing forms, no Commencement Notice or relief not granted before start.Do not start works until CIL liability, relief and commencement steps are checked.
Enforcement not acceptedIssue is boundary, party wall, building control or private dispute.Check Wandsworth “can/cannot investigate” list before reporting.
Local insider tips

Wandsworth-Specific Planning Tips That Save Time

Nine Elms and riverside sites

Check flood risk, wind, daylight/sunlight, servicing, tall-building impact, fire strategy, energy, public realm and BNG.

Conservation streets

Check windows, doors, roof changes, materials, front boundaries, shopfronts and Article 4 restrictions before design work is finalised.

Flats and conversions

Do not assume householder permitted development rights apply. Wandsworth says flats in converted houses need full planning forms.

BNG and UGF

Resolve BNG and urban greening before the layout is fixed. Retrofitting habitat later can be costly or impossible.

Public comments

Write planning reasons only. Avoid private disputes, property value, covenants, party-wall issues and construction complaints.

Applicants

Before upload, test print PDFs, check scale bars, split oversized files, label revisions and keep existing/proposed drawings separate.

Editorial audit

Official Source and PDF Details Converted Into This Page

  • Wandsworth search page: all planning records are now online; Planning Explorer is for post-2000 cases; Planning Archive is for pre-2000 cases; map search can show live and decided applications.
  • Planning Explorer: specific search uses reference format YYYY/XXXX and allows wildcard % for partial information; general search supports combined fields and date search.
  • Comment guidance: name/address required, anonymous comments not accepted, comments are published, optional contact details should not be put in the comment text.
  • Comment timing: most applications have a 21-day consultation; re-consultation on amendments is typically 14 days where undertaken; online comments have a 4,000-character limit.
  • Make application page: Wandsworth recommends Planning Portal, notes the service charge, confirms validation date can differ from received date and lists small-site affordable housing contribution timing.
  • Application process page: targets are 8 weeks for householder/small scale, 13 weeks for major and 16 weeks for EIA; invalid application reasons include no fee, no CIL form and no scale bar.
  • Validation checklist PDF: national requirements include form, location plan, site plan, floor/roof plans, sections, elevations, fee, ownership certificate and Design and Access Statement where needed.
  • Local requirements: fire, air quality, biodiversity, energy, CIL, contamination, daylight/sunlight, flood risk, heritage, archaeology, waste, servicing and other reports can be triggered.
  • Maps/plans PDF: location plan scale, red line, blue line, block plan, north arrow, boundary dimensions, trees, roads, public rights of way and OS licence issues are covered.
  • Electronic files: CAD not accepted; scalable PDFs needed for scale drawings; online total should not exceed 25MB; individual files should not exceed 5MB; file naming and orientation matter.
  • BNG page: BNG is mandatory for new planning permission applications unless exempt; 10% minimum applies where subject to BNG; exemptions still need a checklist and biodiversity consideration.
  • CIL guidance: Wandsworth collects Mayoral and Wandsworth CIL; missing forms or Commencement Notice can create surcharges and loss of relief.
  • Enforcement pages and PDF: enforcement is discretionary and proportionate; Wandsworth can investigate planning breaches but not party-wall, boundary, private neighbour or building-regulation disputes.
FAQs

Wandsworth Planning Portal FAQs

Where do I search Wandsworth planning applications?

Use Wandsworth Planning Explorer for applications submitted after 2000. Use the Planning Archive for applications submitted before 2000.

What format is a Wandsworth planning reference?

The specific application search asks for the complete case reference or planning application number in the format YYYY/XXXX. You can use wildcard % when you only have partial information.

Can I search Wandsworth planning applications on a map?

Yes. Wandsworth says map search can show live and decided planning applications in an area, with live applications highlighted in red.

Can I comment on a Wandsworth planning application online?

Yes. Find the application in Planning Explorer, open the associated documents and online comments link, then use the comment button if the application is still open for consultation.

Can I submit anonymous planning comments in Wandsworth?

No. Wandsworth says it cannot accept anonymous objections or letters of support and requires a full postal address with any representation made.

How long is the Wandsworth consultation period?

Most applications have a statutory 21-day consultation period. Wandsworth says it may accept comments after the consultation period until a decision is made.

How do I apply for planning permission in Wandsworth?

Wandsworth says the easiest way is to apply online through the national Planning Portal, where you can make the application and payment online.

What file limits apply to Wandsworth electronic planning applications?

For online submission, Wandsworth says the combined size of files should not exceed 25MB and individual files should not exceed 5MB. CAD, .exe and zipped submissions should not be used.

Is Biodiversity Net Gain required in Wandsworth?

Wandsworth says BNG is mandatory for new planning permission applications. Where BNG applies, development must demonstrate at least 10% biodiversity net gain over the pre-development value of the site.

How do I report a Wandsworth planning breach?

Check the planning applications database first. If permission is required and has not been granted, use the relevant Wandsworth enforcement form for building works, breach of condition, change of use or unauthorised advertisement.

Editorial disclaimer: This guide is educational and helps users navigate Wandsworth planning tasks. Planning records, consultation deadlines, application forms, fees, CIL, BNG, validation documents, enforcement policy, file rules, contact details and official links can change. Always verify live records, payments and deadlines on Wandsworth Council, GOV.UK or Planning Portal official pages before acting.
Final summary

Final Summary: Wandsworth Planning Actions

Search:

Use Planning Explorer for post-2000 applications, the Planning Archive for pre-2000 records, and map/area notifications for local monitoring.

Comment:

Read the latest documents and use planning reasons. Your name and address are required, comments are public, and online comments have a 4,000-character limit.

Apply:

Use Planning Portal after checking Wandsworth validation, file-size rules, red/blue lines, CIL, BNG, energy, flood, daylight and heritage triggers.

Report:

Search permission history first, then use the correct enforcement form with address, dates, photos, breach type and planning harm.